Exhibit A and Exhibit B, done: a clean easement sketch plus the metes-and-bounds legal description write-up, ready for the attorney or recorder — starting at $85.
Utility, access, drainage, and temporary construction easements drafted from your survey data or record documents, with the parent parcel context that makes the exhibit read at a glance.
Rates are starting points — every project gets a fixed quote and timeline up front. Rush turnaround (under 48 hours) adds 25%.
Delivered white-label under your title block, on your layers — with unlimited revisions until your reviewer signs off.
Yes — every easement exhibit includes the metes-and-bounds write-up, checked against the drawn geometry so the two never disagree.
Utility, ingress/egress and access, drainage, temporary construction, conservation — any strip or parcel easement your project needs.
The parent parcel survey or deed, and the easement's intended location (centerline and width, or sketch). We calculate the geometry and write the description.
Sheets are formatted to your county's exhibit conventions; your licensed surveyor reviews and certifies before recording.
Usually within one business day. Or reach out directly: